Net Zero Manufacturing

Mynt has completed phases I and II of a three-phase project to drive this IT manufacturing facility building to net zero energy. We have begun engineering on the parking lot solar structures which will provide the remaining 1/3 of its power and complete this project (Phase III) in Q4...

View More

Pitco Foods

Installation Date: February 2017 Building Size: 42,000 sq. ft. Existing Equipment: Metal halide 400-watt lighting Upgrades: Replaced high bay lighting with LED and added occupancy sensors Results: 118,456 annual kWh savings $21,381 first year savings Challenge: Due to insufficient lighting produced by the antiquated 400-watt metal halide units, the...

View More

Hyatt Regency San Francisco Airport

The Hyatt Regency San Francisco Airport is a nine-story hotel located in Burlingame, California. The close proximity to the San Francisco Airport and events held in the beautiful atrium located at the center of the property created a need for sound attenuation. Acoustical panels were installed on the atrium...

View More

Happy Valley Elementary

Happy Valley Elementary is located in Santa Cruz, California. Happy Valley was looking for a customized approach to designing a project that utilized their Proposition 39 funding. As a single school district, they have limited resources for project planning and management. Mynt Systems was selected to be their energy...

View More

St. Michaels Catholic Church

St. Michaels Catholic Church in Boulder Creek, CA was looking to increase the amount of light in the church while saving energy. They were also inspired by Pope Francis’ encyclical on the environment and human ecology to install solar on the rooftop of the church. Mynt Systems worked with the...

View More

Gilroy Prep, Gilroy CA

Gilroy Prep is a charter school located in Gilroy, CA. The school wanted to utilize their Proposition 39 allocation, but was not happy with the solutions that were being provided by the district’s consultant. Their main concern was they wanted an HVAC controls solutions that could be managed remotely...

View More

Romig Engineers, San Carlos CA

Installation Date: May 2016 Building Size: 12,440 Existing Equipment: T8 Fluorescent Lighting with Parabolic Lenses Upgrades: Recessed LED Troffers with Integrated Lighting Controls Challenge: All three floors of the facility had recessed fixtures with parabolic lenses. The directional characteristics of LED lamps don’t work well with parabolic lenses so...

View More
Lofts

Viridian Lofts, San Diego CA

Interwest Capital Corporation is a real estate investment firm specializing in mortgage and real estate acquisitions. It primarily acquires, develops, and rehabilitates, office, retail, industrial, hospitality, and mixed-use properties. Interwest Capital was looking to reduce their energy bills for the Viridian Lofts parking facility in downtown San Diego which operates...

View More

What is Energy Efficiency?

What is energy efficiency? Energy is a big subject. Where do we get it? How do we use it? How should we plan for the future use of it and what are the environmental and political implications of these choices? It’s too big of a subject for most people...

View More

HGST, Window Film

HGST, Inc. (formerly Hitachi Global Storage Technologies) is a subsidiary of Western Digital that sells hard disk drives, solid-state drives, and external storage products and services. Their U.S. Headquarters are located in San Jose, California. HGST was looking for maximum energy savings and inhabitant comfort improvement while maintaining a...

View More
  • 1
  • 2