5.7 megawatts, behind the meter
MYNT designed, engineered, and built 5.7 MW of behind-the-meter solar for GraniteRock, a century-old California construction-materials producer: one contract, in-house engineering, IBEW crews onsite through PTO.
of solar PV behind the meter, sized against a heavy industrial daytime load.
IBEW crews. MYNT's own electricians built it, no subbed-out labor, onsite through PTO.
engineer build operate. In-house engineering stamped it; AMPS operates it for the life of the asset.
Problem, system, result
The problem
Construction materials are energy-intensive to produce, and the load runs all day, exactly when California commercial rates and demand charges bite hardest. Buying every kilowatt-hour from the utility meant a large, rising, uncontrollable line item.
The system
5.7 MW of solar PV interconnected behind GraniteRock's own meter, so generation offsets consumption directly before a single kilowatt-hour is purchased. MYNT carried it from first-principles design through engineering, permitting, construction, and commissioning: the same team, end to end.
The result
The mechanism is solar self-consumption: onsite generation meets the daytime industrial load first, cutting purchased energy and the peaks that set demand charges. Measured first-year results publish here once verified against AMPS O&M data. We report numbers we can stand behind, not projections.
From the field





GraniteRock Watsonville, California
Keep reading
Be electric
One conversation, one site walk, one number: what your building should be making.
Keep exploring: commercial solar, end to end, what commercial solar costs in California, and the Haven Avenue build.