Named clients. Hard numbers.
Every system below was designed, engineered, and built by MYNT's own IBEW crews, and most are operated under AMPS for the life of the asset.
MYNT crews on siteDesign build operate
The record
County of Monterey 1.4 MW + 2,100 kWh BESSMYNT built
A solar + battery microgrid that islands the county's main administrative building through grid outages.
1.4 MW + 2,100 kWh
Haven Avenue 620 kW PV + 750 kWh LFPMYNT built
Two rooftops, two carports, and one LFP battery cutting tenant utility costs at a multi-tenant property.
620 kW + 750 kWh
Fireclay Tile 580 kW rooftop PVMYNT built
Rooftop solar generating roughly 60% of a handmade-tile factory's energy on its own roof.
580 kWOne crew, start to finish
0
projects delivered vertically integrated. The team that stamped the drawings stands behind the system.
0
of commercial solar, storage, and microgrids designed, engineered, and built by MYNT's own crews.
0
where MYNT's in-house engineering is PE-licensed.
Be electric
Hit us up →Keep exploring: capabilities, answers, and the team.